
Crane Loading Tests on the “Kiera Fiona”
The “Kiera Fiona” has undergone crane loading tests and is in the latter stages of internal outfit at Havyard in Norway.
The “Kiera Fiona” has undergone crane loading tests and is in the latter stages of internal outfit at Havyard in Norway.
A keel laying ceremony has taken place for the 90′ fishing vessel “Atlantic Titan” being designed and built in collaboration with Shipbuilding Asia Ltd in Vietnam, representatives from Macduff Ship Design were present during the signing.
The latest vessel “Kiera Fiona”building for Inverlussa Marine Services is well underway at Havyard, this is the fourth and longest vessel designed for the owners by macduff ship design.
Macduff Ship Design is pleased to announce that it has been commisioned to design a 14m mooring / line handler / general service tug by Cheoy Lee Shipyards.
The construction for a new Seiner has begun for Bruce Buchan the vessel lengthened during the design phase from 23.00m to 24.00m having a partial aluminium shelter top and aluminium wheelhouse.
The Gina Mary has completed trials and has been handed over to her delighted owners, Inverlussa Marine Services, this vessel is the third design by Macduff for the owners base on the Isle of Mull. The first two were built by Macduff Ship yards this near repeat vessel was built by Havyard in Norway and lengthened during construction by two meters to provide additional working capacities.