We are delighted that the build contract has been signed with Tehnomont Shipyard in Croatia to deliver a 24.90m fishing trawler. The design of the twin rig vessel provides accommodation for a crew of 12 comprised of 2x twin cabins and 2x 4 man cabins on the main deck. She has been designed to carry 40,000 litres of fuel in her double bottom tanks and 17000 litres of fresh water in double bottom and bulb tanks.
#DesigningToDeliver